MoDOT announces pre-qualified teams for 291 River Bridge project

LEES SUMMIT, MO - The Missouri Department of Transportation received Statements of Qualifications from teams interested in competing for the contract to design and construct the 291 River Bridge Design-Build Project. This project will include replacement of the northbound bridge and rehabilitation of the southbound bridge. Five teams have been selected to begin developing the proposals for the project.

The pre-qualified teams are:

American Bridge Team

  • American Bridge Company, Garver, LLC

Ames Team

  • Ames Construction, Inc., HNTB Corporation

Hawkins Team

  • Hawkins Construction Company, United Contractors, Inc., HDR Engineering, Inc.,

Lunda Team 

  • Lunda Construction Co, T.Y. Lin International, GFT Infrastructure, Inc.

Massman Team

  • Massman Construction Co., Parsons Transportation Group, Inc., Hg Consult, Inc.

MoDOT will issue the Request for Proposals in early July. The proposals are due in late October with selection of the Best Value Proposer in early December.

For more details about the project, visit the project webpage at 291 River Bridge.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Tech Daily Missouri

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.